chore: bump eslint from 9.9.0 to 9.18.0 #10395
Annotations
2 errors and 1 warning
Add a label if tests have passed (PR)
HttpError: Resource not accessible by integration
|
Add a label if tests have passed (PR)
Resource not accessible by integration
|
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Set up job
3s
3s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Capture pull request number from branch name
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Add a label if tests have passed (PR)
1s
1s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Add a label if tests have passed (dispatch)
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Remove the label if tests failed
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Open issue if build breaks
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Open issue if tests fail
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Complete job
0s
0s
Error:
This step has been truncated due to its large size. Download the full logs from the menu
once the workflow run has completed.
Loading