[release-1.2] backport changes from main branch #943
Merged
Red Hat Konflux / Red Hat Konflux / operator-v1-2-enterprise-contract / pr group
succeeded
Mar 24, 2025 in 1m 10s
Succeeded
Integration test for snapshot operator-v1-2-t5glx and scenario operator-v1-2-enterprise-contract has passed
Details
- Pipelinerun: operator-v1-2-enterprise-contract-vt248
Task | Duration | Test Suite | Status | Details |
---|---|---|---|---|
verify | 1m6s | ✔️ 324 success(es) |
The group snapshot is generated for pr group tturek/backport-main-to-1.2 and the component snasphots as below:
Component | Snapshot | BuildPipelineRun | PullRequest |
---|---|---|---|
rhtas-operator-bundle-v1-2 | operator-v1-2-jzn9n | rhtas-operator-bundle-on-pull-request-nwkdp | secure-sign-operator |
rhtas-operator-v1-2 | operator-v1-2-f6l7k | rhtas-operator-on-pull-request-q6zcq | secure-sign-operator |
Loading