Skip to content

Changed fixtures, banner, logo #1682

Changed fixtures, banner, logo

Changed fixtures, banner, logo #1682

Triggered via push March 4, 2025 08:29
Status Failure
Total duration 46m 41s
Artifacts

build.yml

on: push
Static checks  /  Get matrix
3s
Static checks / Get matrix
Matrix: Static checks / static-checks
End-to-end tests (MySQL)  /  Get matrix
3s
End-to-end tests (MySQL) / Get matrix
Matrix: End-to-end tests (MySQL) / behat-no-js
Matrix: End-to-end tests (MySQL) / behat-ui-js-chromedriver
Matrix: End-to-end tests (MySQL) / behat-ui-js-panther
Fit to window
Zoom out
Zoom in

Annotations

10 errors
End-to-end tests (MySQL) / JS with Chromedriver, PHP 8.2, Symfony ^6.4 (test_cached), MySQL 8.4, Twig
The job running on runner GitHub Actions 52 has exceeded the maximum execution time of 45 minutes.
End-to-end tests (MySQL) / JS with Panther, PHP 8.2, Symfony ^6.4 (test_cached), MySQL 8.4, Twig
The job running on runner GitHub Actions 35 has exceeded the maximum execution time of 45 minutes.
End-to-end tests (MySQL) / JS with Panther, PHP 8.3, Symfony ^7.1 (test_cached), MySQL 8.4, Twig
The job running on runner GitHub Actions 27 has exceeded the maximum execution time of 45 minutes.
End-to-end tests (MySQL) / JS with Chromedriver, PHP 8.3, Symfony ^7.1 (test_cached), MySQL 8.4, Twig
The job running on runner GitHub Actions 37 has exceeded the maximum execution time of 45 minutes.