Skip to content

Merge pull request #4171 from pleroy/Optimization #1456

Merge pull request #4171 from pleroy/Optimization

Merge pull request #4171 from pleroy/Optimization #1456

Triggered via push February 20, 2025 17:07
Status Failure
Total duration 20m 14s
Artifacts

build.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (Release)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build (Release)
The self-hosted runner: marco-polo lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
build (Debug)
The job was canceled because "Release" failed.