Support empy v3 and v4. #549
ci.yaml
on: pull_request
Pytest
14s
ROS 1 Config Validation
18s
ROS 2 Audit
33s
ROS 2 CI
15s
ROS 2 Config Validation
23s
ROS 2 Devel
18s
ROS 2 Doc (Noble)
18s
ROS 2 Doc (Jammy)
19s
ROS 2 Prerelease
17s
ROS 2 Release
20s
ROS 2 Release Reconfigure
18s
ROS 2 Release (RPM)
18s
ROS 2 Sync Criteria Check
18s
ROS 2 Sync Criteria Check (RPM)
18s
ROS 2 Trigger
19s
Matrix: ROS 1 Audit
Matrix: ROS 1 Doc
Matrix: ROS 1 Prerelease
Matrix: ROS 1 Prerelease (External)
Matrix: ROS 1 Release
Matrix: ROS 1 Release Reconfigure
Matrix: ROS 1 Status Pages
Matrix: ROS 1 Sync Criteria Check
Matrix: ROS 1 Trigger
Annotations
19 errors and 5 warnings
ROS 2 CI
Process completed with exit code 1.
|
ROS 1 Trigger (3.6)
Process completed with exit code 1.
|
ROS 2 Prerelease
Process completed with exit code 1.
|
ROS 2 Devel
Process completed with exit code 1.
|
ROS 1 Sync Criteria Check (3.6)
Process completed with exit code 1.
|
ROS 2 Doc (Jammy)
Process completed with exit code 1.
|
ROS 1 Prerelease (3.6)
Process completed with exit code 1.
|
ROS 2 Release Reconfigure
Process completed with exit code 1.
|
ROS 2 Doc (Noble)
Process completed with exit code 1.
|
ROS 1 Release Reconfigure (3.6)
Process completed with exit code 1.
|
ROS 2 Release
Process completed with exit code 1.
|
ROS 1 Prerelease (External) (3.6)
Process completed with exit code 1.
|
ROS 1 Doc (3.6)
Process completed with exit code 1.
|
ROS 1 Status Pages (3.6)
Process completed with exit code 1.
|
ROS 1 Release (3.6)
Process completed with exit code 1.
|
ROS 2 Release (RPM)
Process completed with exit code 1.
|
ROS 2 Sync Criteria Check
Process completed with exit code 1.
|
ROS 2 Sync Criteria Check (RPM)
Process completed with exit code 1.
|
ROS 2 Trigger
Process completed with exit code 1.
|
Pytest
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
ROS 1 Config Validation
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
ROS 2 Config Validation
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
ROS 2 Audit
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
ROS 1 Audit (3.6)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|